THE NASRID MARISTÁN OF GRANADA.
RESTORATION OF A MONUMENT AT A
DIFFICULT CROSSROADS
EL MARISTÁN NAZARÍ DE GRANADA. RECUPERACIÓN DE UN
MONUMENTO EN UNA DIFÍCIL ENCRUCIJADA
PEDRO SALMERÓN ESCOBAR
DIEGO GARZÓN OSUNA
FRANCISCO CAMPOS FERNÁNDEZ
ROSA PÉREZ DE LA TORRE
PHD IN ARCHITECTURE. CURATOR OF THE
CATHEDRALS OF GRANADA AND JAÉN
PHD IN ARCHITECTURE. SPECIALISES IN THE
CONSERVATION OF IMMOVABLE
HISTORICAL HERITAGE
TECHNICAL ARCHITECT. SPECIALISES IN THE
CONSERVATION OF IMMOVABLE HISTORICAL HERITAGE
DEGREE IN ART HISTORY. SPECIALISES IN HISTORICAL–
DOCUMENTARY STUDIES APPLIED TO INTERVENTIONS
IN IMMOVABLE HISTORICAL HERITAGE
estudiopedrosalmeron2@gmail.com
diegogarzon@arquired.es
pcampos@coaatgr.es
rosastrea@gmail.com
AbstrAct: this article considers the consolidation and restoration project of the southern portico of the
Maristán. Outstanding historical keys that go beyond the mediaeval period, are provided, and events of
the long process that takes place since its incorporation into the public heritage in 1984 until today, are
explained. As the recovery of this building is made from remains in very poor conditions, the methodolo-
gy followed in the project is detailed, and technical solutions that act as a support for a difficult path that
interacts with the remains of the original building and makes it understandable as a spatial and functional
structure, are described.
Keywords: maristán, mint, restoration, consolidation, recovery
resumen: este artículo trata fundamentalmente del proyecto de consolidación y restauración del pórtico
sur del Maristán. Se aportan las claves históricas más relevantes que no se detienen en la etapa medieval, y
se explican las vicisitudes del largo proceso que transcurre desde su incorporación al patrimonio público en
1984 hasta hoy. Como la recuperación de este edificio se hace a partir de unos restos en condiciones muy
deficientes de conservación, se detalla la metodología seguida en el proyecto y se describen las soluciones
técnicas que actúan como soporte de un difícil camino que interactúa con los restos del edificio original y
lo hace comprensible como estructura espacial y funcional.
PAlAbrAs clAves: maristán, casa de la moneda, restauración, consolidación, recuperación
cómo citAr / how to cite: SALMERON ESCOBAR, P., CAMPOS FERNÁNDEZ, F., GARZÓN OSUNA, D.,
PÉREZ DE LA TORRE, R., El Maristán nazarí de Granada. Recuperación de un monumento en una difícil
encrucijada, Cuaderno de la Alhambra. 2020, 49, págs. 251-271. ISN 0590-1987
CUADERNOS DE LA ALHAMBRA I núm. 49 I 2020 I págs. 251-271
Recibido: 17 septiembre 2020 | Revisado: 2 octubre 2020 | Aceptado: 22 octubre 2020 | Publicado: 24 diciembre 2020
ISSN: 0590 - 1987 I eISSN: 2695-379X I Depósito legal: GR 70-1965
1. Introduction
The Maristán de Granada is located in the heart of
the lower Albaicín, in front of the Monasterio de la
Concepción, very close to Carrera del Darro. Foun-
ded by Muhammad V in 1367, it is an exceptional
testimony to the splendour of 14th century Granada,
and the Maristán is the only hospital in Al-Andalus
about which there is any significant information.
The remains of the Maristán have presented a diffi-
cult challenge in terms of their restoration because
they are structures that have survived after being
encased by and combined with other, later cons-
tructions that were interwoven with the medieval
buildings, and have been practically demolished in
their entirety. When destruction of the Maristán was
halted in 1984 it meant the beginning of interesting
work to remove the construction elements that hid
the original structure in the part of the building that
remains standing at the far south of the plot.
At the same time, highlights of the the initial ar-
chaeological campaign carried out in 1984–1986
IL. 1. Juan Antonio García Granados. South pavilion, with part of its roof collapsed, once the archaeological excavation of the site and the work
to remove debris from the pool had begun (1985).
included the appearance of low standing remains
from other bays in the building and a first section of
the patio pool. There is still a section of unexplored
soil in the remaining land with intense filling that
may well lead to extremely interesting information
about this monument. Since then, an alliance has
been forged between remains that are in danger of
disappearing and a fertile subsoil that sustains our
knowledge of such a complex past.
Some interesting data regarding the dimensions
are provided below (measurements were taken on
the middle axis of each space):
- The Maristán plot: 37,30 x 25,15 m.
- Courtyard: 26,16 x 15,00 m.
- Pool. Surface of water: 16,20 x 4,50 m.
Depth: 1,10 m.
- Pool including thickness of wall
(1,25m): 18,70 x 7,00 m.
1. TORRES BALBÁS, L. El Maristán de Granada. In: Crónica de la
España musulmana XV, vol. IX, 1944, p. 497.
2. DESSALINES D' ORBIGNY, A. Viaje pintoresco á las dos Amé-
ricas, Asia y África. Imprenta y librería de Juan Oliveres, Vol. 3,
1842, p. 5.
3. CLAYE, J. [imp.], GIDE [ed.], GAILHABAUD, J. [ed. lit.]. L'ar-
chitecture du Vme. au XVIIme. siècle et les arts qui en dépendent:
la sculpture, la peinture murale, la peinture sur verre, la mosaïque,
la ferronerie, etc. / publiés d'après les travaux inédits des principaux
architectes français et étrangers par Jules Gailhabaud. Paris: Gide,
Éditeur, T. 3, 1858, s.p. Available online: https://catalog.hathi-
trust.org/Record/009268277 [Access 03/09/2020].
4. TORRES BALBÁS, L. (1944). Ob. cit., p. 489.
5. SALVATIERRA CUENCA, V.; GARCÍA GRANADOS, J. A. El Ma-
ristán: visión arqueológica. In: El Maristán de Granada: un hospi-
tal islámico. Granada: Spanish Association of Neuropsychiatry,
1989, p. 51.
IL. 2. Francisco Enríquez, Floor plan of the Arab Hospital in
Granada. In: CLAYE, J (imp.), GIDE (ed.), GAILHABAUD, J (ed. lit.).
Hospital Arabe a Grenade. Plan, T. 3, n.d. (1858).
https://cutt.ly/XhcAYWu
2. Historical-documentary research
to support intervention
Building work on the Maristán began in September
1365 on the orders of Muhammad V and lasted un-
til June 1367, according to the foundation stone that
adorned its entrance gate. One of the reasons for its
swift construction could be due to the existence of
a previous building on the site with a similar mor-
phology and distribution of spaces.
The function of this hypothetical building is unk-
nown, although the division of its floor plan into
four bays set around a central patio suggests it may
have had a similar use to a fanadiq (inn), ribat (mo-
nastery) or madrasa (Islamic school), or particularly
to the contemporary Marinid schools of Morocco
1
(14th century). Along similar lines to a fanadiq, the-
re has also been speculation that is possibly functio-
ned as an okels
2
(Khans or caravasar) because of its
typological similarities with this family of oriental
buildings
3
. Also, it has frequently been observed to
have a similar floor plan and elevation to the Corral
del Carbón in Granada.
The Nasrid Maristán may have resulted from the
refurbishment of a pre-existing building, to which
a second floor and pool were probably added while
access to the rooms was modified. The old hospi-
tal therefore had a rectangular floor plan with four
two-storey bays –symmetrical with their opposite
side and preceded by a porticoed gallery– arran-
ged around a central courtyard with a pool in the
centre that was flanked on its longest sides by two
monumental lion sculptures, now at the Alhambra
Museum.
The stairs were presumably located in the centre
of the longest sides, while the northern façade was
used as the main entrance where the foundation
stone of the hospital
4
, was placed ; this stone detai-
led that the sultan was the patron of the work, its
function, period of construction, etc.
It is not known on what date the building began to
be used as a mint. Some historians date this new
use after the conquest of the city by the Catholic
Monarchs (1492) or slightly later, between 1499
and 1502
5
; while others claim that it was an Arabic
mint before that date due to the construction of a
new hospital in Plaza de Bibalbonud
6
(today Placeta
del Abad) in the mid-15th century.
The 1980 excavations in the south bay documen-
ted the changes made to the layout of the medieval
building: essentially, some rooms were expanded
by joining together pre-existing spaces and the in-
terior corridor that connected all the sides was eli-
minated.
As a result of a visit to the building by royal man-
date in 1585, sources state that at this time approxi-
mately «one hundred workers and coin makers,
relatives of one another»
7
worked there. At this
6. MARTÍN GARCÍA, M.; GARCÍA GRANADOS, J. A. El Maristán
tras el hallazgo de sus restos. In: Cuadernos de Arte de la Universi-
dad de Granada, XIV. XVI, 1984, p. 10.
7. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita a
la Real Casa de la Moneda de Granada (1582). Fomento/ Sig. C.
01929.0020.
8. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita a
la Real Casa de la Moneda de Granada (1582). Fomento/ Sig. C.
01929.0020.
9. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita
a la Real Casa de la Moneda de Granada (1655). Fomento/Sig.
C.01929.0034.
10. TORRES LÁZARO, J. Obreros, monederos y casas de mone-
da. Reino de Castilla, siglos XIII-XV. Anuario de estudios medieva-
les, núm. 41, 2, 2011 (Ejemplar dedicado a Tecnología Medieval
en el Mediterráneo Occidental), p. 676. Available online: https://
dialnet.unirioja.es/servlet/articulo?codigo=3836851 [Access
03/09/2020].
11. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita
a la Real Casa de la Moneda de Granada (1655). Fomento/Sig.
C.01929.0034.
12. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita
a la Real Casa de la Moneda de Granada (1661). Fomento/Sig.
C.01929.0039.
13. TORRES LÁZARO, J. (2011). Ob. cit. p. 676.
IL. 3. Pedro Salmerón Escobar, Diego Garzón Osuna. Restoration of
the Maristán floor plan, identifying the preserved remains. (2019).
Terrace with medieval structure.
Complete original wall elements.
Remains of walls and foundations
revealed during archaeological
projects.
Theoretical plan of elements that have
been lost or not yet excavated.
Hypothetical covering of
supplementary parts.
Leyenda:
1. Main entrance
2. Possible alternative entrance
3. Staircase to upper floor
4. Patio
5. Pool
6. Lions (Alhambra Museum)
7. Main rooms
8. Corner room
Possible location of staircase
9. Room
10. Possible second entrance
11. Peristyle
stage, the mint needed repairs, especially to its ti-
led roofs, which were partly sunken and damaged,
and the pool «which was itself neglected and the
drain was blocked»
8
.
The most important room, known as the Treasu-
re Room –recorded as being in the upper storey of
the south bay– was «where the treasurer and other
senior officers of the house usually worked»
9
. The
rooms where the coin was minted (minting works-
hop
10
) are presumed to have been on the ground
floor, very close to the Treasury (probably also in the
south or west bay), and there may have been a pos-
sible alternative entrance to the main entrance
11
on
Calle Bañuelo.
In Granada, there were as many as «eight sma-
ll furnaces (hornaças)»
12
. There were also other
technical departments: a room for the engraver
(perhaps a workshop for engraving dies
13
), a smel-
ting room («quarto de las fundiciones») where the
copper coin was melted with the silver coin; and a
IL. 4. Francisco Enríquez, Façade and drawing of constructive,
decorative and sculptural elements. In: CLAYE, J (imp.), GIDE (ed.),
GAILHABAUD, J (ed. lit.) Hospital Arabe a Grenade. Elevation et
Coupe longitudinale, 1858, T. 3, s.p. https://cutt.ly/IhcASP7
final unit, which functioned as a testing laboratory
(«quarto del ensaio»
14
).
During the first third of the 17th century, Andrés
Horacio de Lebanto is recorded as being the treasu-
rer and owner of the house. On his death, the estate
passed to his daughter in 1637; however, it was not
definitively adjudicated until 1656 because the will
triggered a lawsuit among his relatives
16
.
Later, the building was acquired by the Discal-
ced Mercedarian friars of the Convent of Bethle-
hem
17
, and this community proceeded to sell it in
1748. From this moment onwards, its new owner
–a wine merchant named José Merchante– began
a programme of works that would transform the
building, aiming to adapt it to its new function
18
,
obtaining ample space for storage and stables for
the draught animals.
A new sale must have taken place in around 1825
because it then functioned as a «prisoners’ barrac-
ks»
19
. The inhabitants of the penitentiary even star-
ted a fire in its facilities in 1834, causing serious
damage.
In 1841 the building was acquired by Vicente López
who, on being informed of its ruinous state, re-
quested a licence to demolish it but met with great
opposition from various intellectuals of the period.
At that time, architect, restorer and academic Fran-
cisco Enríquez y Ferrer drew up a series of plans
outlining its distribution with floor plans, cross-sec-
tions, the main façade and its most significant cons-
truction, decorative and sculptural elements.
The protests were ignored and in August 1843 the
north and west bays were demolished. The demoli-
tion was denounced by the Chairman of the Orna-
ment Commission as it did not have the correspon-
ding license from the Municipal Council
20
.
José Giménez Serrano describes the devastated cir-
cumstances in which the property found itself in an
article published in El Siglo Pintoresco in 1846:
«In the centre of the rubble-filled site, one
can still see the pool, around which white
oleander is growing; and among the frag-
ments of carved stucco, luxuriant myrtle
14. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Visita
a la Real Casa de la Moneda de Granada (1661). Fomento/Sig.
C.01929.0039.
15. TORRES LÁZARO, J. Ob. cit., p. 679.
16. ARCHIVO DE LA REAL CHANCILLERÍA DE GRANADA. Pleito
entre Francisca Benita Levanto, vecina de Granada, con Ángela
Levanto y consortes, vecinos de Sevilla sobre la sucesión de los
bienes que dejó Andrés Horacio Levanto (1656). Catálogo de
Pleitos / Caja 586-19.
17. SALVATIERRA CUENCA, V.; GARCÍA GRANADOS, J.A. (1989).
Ob. cit., p. 53.
18. MARTÍN GARCÍA, M.; GARCÍA GRANADOS, J.A. (1984). Ob.
cit., p. 10.
19. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Petición
de que los presos de la Casa de la Moneda sean trasladados,
argumentando las molestias que causan a los vecinos (1834).
Beneficencia y Sanidad/Sig. C.00139.0017.
20. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Corres-
pondencia (1845). Gobierno. Alcalde/Sig. C. 01929.0111.
21. GIMÉNEZ SERRANO, J. España pintoresca. La casa de la Mo-
neda en Granada, El Siglo Pintoresco, Tomo II, núm. 89, 1846, p.
152-153. Available online: http://hemerotecadigital.bne.es/detai-
ls.vm?q=id:0003796854&lang=es [Access 03/09/2020]
stalks and shoots of Alexandria and Bengal
roses are laboriously emerging, which seem
to be trying to cover that sad and desolate
ruin with their green garlands»
21
.
It was later thought that the Maristán had disa-
ppeared completely, except for its entrance, whose
IL. 5. Pedro Salmerón Escobar, Diego Garzón Osuna. Ground floor of the Maristán site, identifying its uses before the 1984 demolition (2019).
IL. 6. Juan Antonio García Granados, 1984, photo. Demolition of the apartment house that occupied the east bay of the Maristán.
«stone with Arabic inscription» was placed in the
capital’s (archaeological) museum on 21 Novem-
ber 1845»
22
. Since then, and until the 1970s, when
initial research into the site began
23
, the remains
of the old building were lost in oblivion. In view
of the important evidence found, in July 1981 the
Commission of Historical and Artistic Heritage de-
cided to initiate proceedings to declare the site an
Archaeological Monument.
Shortly afterwards, the property was sold to some
private individuals who applied for a municipal
building permit to develop an apartment project
inspired by Enríquez’s drawings. At this time, the
property was divided lengthwise, from north to
south, by a wall that took the east side of the pool
as the site of its elevation, creating two sectors that
were divided into plots and occupied by different
buildings.
After a brief period of tension between the suppor-
ters and detractors of this development project, the
Historical Heritage Commission agreed to carry
out excavations, and the Archaeological Museum of
Granada was entrusted with managing this work,
forming a technical team in 1983.
Despite this, the partial demolition of the building
(east side) began without impediment. Before the
damage was irreparable, the museum made an
agreement with the owners to perform the planned
excavations; at the same time, debris was being re-
moved and the Andalusian Government was taking
steps to acquire the plot
24
.
Once the process was completed in 1986, thanks to
the expropriation of the site, new excavation works
and other additional processes were begun and the-
se have continued until practically the present day.
However, intervention and enhancement has been
the big issue in recent years, especially since the
Maristán was made a monument in 2005
25
.
3. Restoration of space and function
3.1. Reflections on the urban location and the
organization of the building
Other important remnants from the medieval pe-
riod are located very close to the space occupied
by the remains of the building such as the Baño
del Nogal, popularly known as Bañuelo, the Nasrid
House of Zafra and the archaeological remains of
the old gate of Los Tableros with its floodgates, a
key point of the coracha (section of wall) that provi-
ded water to the Alcazaba Qadima in the Albaicín
and the Alcazaba of the Alhambra itself. Numerous
people and pack animals travelled across the top of
this inner urban wall to transport water; this was
of strategic importance for the medieval city be-
fore the Acequia Real (Royal Channel) and main
city channels were operative. This functional axis
passes through the Maristán itself and explains the
possibilities offered by its location and its links to
primitive structures related to water; these subjects
will be explored in the archaeological study planned
in the project.
The Maristán has a porticoed structure around a
rectangular courtyard presided over by a large pool.
The rooms are constructed and connected with a
peristyle on the ground floor and a gallery on the
upper floor. There are two possible positions for the
stairs, in the centre of the longest sides, or the cor-
ners; this aspect will be analysed in the archaeologi-
cal research. The courtyard is the main feature and
the two marble lions give a sense of concentrated
22. ARCHIVO HISTÓRICO MUNICIPAL DE GRANADA. Corres-
pondencia (1845). Gobierno. Alcalde/Sig. C. 01929.0111.
23. SALVATIERRA CUENCA, V.; GARCÍA GRANADOS, J. A.
(1989). Ob. cit.,p. 15-16.
24. Ibid, p. 18.
25. DECREE 113/2005 of 26 April declaring the Nasrid Maristán
in Granada an Asset of Cultural Interest, with the category of Mo-
nument. Boletín Oficial de la Junta de Andalucía [online], no. 92,
Seville, 13 May 2005, p. 42-45. Available on the Internet: http://
www.juntadeandalucia.es/boja/2005/92/boletin.92.pdf [Access
04/09/2020]
balance to the discourse of the water in a type of
ritual that probably had both a symbolic and thera-
peutic purpose.
The structure can be described as having a special
magnetism, a subtle attractiveness, if it is imagined
as an architectural object with a firm geometry in
the medieval urban framework, possessing a type
of vanishing point that leads to the Alhambra for-
tification, whose bastions soar straight upwards in
IL. 7. Pedro Salmerón Escobar, Diego Garzón Osuna. Location of the Maristán in the urban plot (2019).
a stunning view that forms a dominant backdrop.
The Maristán was constructed at almost the same
time as the Patio de los Leones and shares with it
the concept of a model with porticos on four sides
and the symbolic presence of lions: strength and
guardianship, conducts for the the most precious
good, water, a vital sustenance that is also aesthetic
and resonant. At the same time, it shares elements
with another earlier palace patio, the patio in Co-
mares Palace, with its decidedly rectangular design
IL. 8. Pepe Marín. General view of the Maristán before the
intervention, Board of Trustees of the Alhambra and Generalife
(2016).
and a pool as the main feature. The utilitarian or-
ganization and distribution of the Maristán, with
small rooms connected to double-storey galleries
is highly reminiscent of the Corral del Carbón, al-
though each building had a different function.
The only part of the original building that survi-
ves as a decent-sized structure is the south sector.
Its roof is a metallic gabled structure covered and
sealed with fibre cement sheets. This covering
was made in 1988-1989 under the management
of architect Eduardo Martín Martín and became
the building’s image until 2020. Its protective
function, originally intended for a limited period
of time, remained for over three decades. This
long period of paralysis was undoubtedly due
to a lack of funds but another equally important
factor must be taken into account: the dilemma
surrounding how to restore such a damaged and
controversial physical structure with such fragile
building materials.
3.2. The dilemma of how to proceed with
restoring the property
The reconstruction debate has a long history, es-
pecially in a continent like Europe that has been
punished by two world wars with far-reaching des-
tructive consequences. The concept of recovering
an identity lost in such a traumatic way has been
behind widespread mimetic reconstructions, what
occurred in Warsaw after the Second World War, for
example; cases in which a more distant restoration
has been used with a commitment to contempo-
raneity have been more successful. This could be
applied in the case of the Maristán, where different
actions are viable depending on what is preserved
in a process that adds the necessary objectivity to
the restoration.
It has been very difficult to progress towards fin-
ding a solution for the Maristán without dividing
any intervention into the property into two or more
stages. Any attempts to establish a unitary project
without distinctions have proved unsatisfactory.
The complete reconstruction of the building has
run up against legal and methodological problems
because a large part of the building is lost. If there is
no solid starting base, a false copy of what disappea-
red could be produced, as Carlo Ceschi explains
26
,
without meeting the applicable requirements in an
intervention in historical heritage in accordance
with the current legislation and the directives and
regulations in this area. In contrast, the southern
pavilion offers a solid anchorage point that sets it
apart from the rest.
After several attempts to find a viable solution by
the Department of Culture of the Andalusian Go-
vernment, the process sped up in 2016 when the
Board of Trustees of the Alhambra and Generalife
was entrusted with financing an intervention; the
Board welcomed this challenge within its program-
me of buildings linked to the Alhambra in the city
of Granada. In this way, continuity was given to an
interesting relationship with a new management
26. CESCHI, C. Teoria e storia del restauro. Roma, 1970. Capítulo
XII: Esperienze di guerra e problematiche della ricostruzione, p.
168-208.
concept that began in 1933 when the Corral del Car-
bón was acquired and declared a monument thanks
to architect Leopoldo Torres Balbás, who ran a bri-
lliant policy of acquiring relevant pieces of urban
architectural heritage from the Hispano-Muslim
period
27
.
The remains can be divided into three recognisable
areas that can be approached differently: the south
portico, the pool and the rest of the building’s bays
where various archaeological remains have emer-
ged. The intervention becomes unblocked from a
conceptual point of view when these parts are diffe-
rentiated to be worked on in two phases. The initial
2016 commission focused on the south portico and
the closest sector of the pool to ensure the interven-
tion made sense, because working on the pool exp-
lains its relationship with the patio as the defining
feature of this beautiful building.
3.3. Intervention on the south portico and the
pool from a conceptual perspective
The south portico represents value in itself despite
being in ruins because every action on each consti-
tuent material, whether this is wood, brickwork or
rammed earth, can be followed step by step as these
elements are dismantled, reassembled or reinfor-
ced. In other words, there is enough evidence to
make a rigorous analysis of the situation and propo-
se the most appropriate action. Too much time has
passed since it was put in place, but the temporary
cover has protected the remains from disappearing.
Much can be learned from the lesson they offer,
their positioning, their capacity for closing and de-
fining spaces, which is indicated by the textures of
the bare walls that also speak of an evolution. These
vestiges have sufficient power of seduction. Inven-
tion is unnecessary, instead it is a question of wor-
king alongside them.
The project marked out the actions and proposed
which parts should be dismantled for restoration
and then replaced, such as the wooden beams of
the battens or the brick columns of the portico that
are still standing. The walls were not demolished
and were reinforced by encasing them in a way
that was compatible with the original to recover
their load-bearing and functional value. In terms
of individual elements such as wooden joists etc.
that could not be replaced in the building due to
excessive damage, plans were made to store these
elements in the spaces made available for this pur-
pose at the Board of Trustees of the Alhambra and
Generalife, or to exhibit them in the building itself
with a selection of the most significant, as indicated
IL. 10. Manuel Torres Molina Granada. Corral del Carbón, patio.
Interior view of the patio of the Corral del Carbón, with the water
basin in the centre and two floors of arcades (1930-1933?).
APAG. Colección de fotografías. F 07298.
IL. 9. Manuel Torres Molina “Patio of the Corral del Carbón (before
restoration)”. The Corral del Carbón is one of the few examples of
public Arab architecture that is preserved in Granada. It was part
of the non-residential structure of the Islamic city where the main
commercial activities took place. (1920-1930).
APAG. Colección de fotografías. F 00012.
27. SALMERÓN ESCOBAR, P. Torres Balbás. Los inicios de la
planificación en la Alhambra. In: Leopoldo Torres Balbás y la restau-
ración científica Ensayos. Granada: Patronato de la Alhambra y Ge-
neralife, Instituto Andaluz de Patrimonio Histórico, 2013, p. 109.
IL. 11. Pedro Salmerón Escobar, Diego Garzón Osuna. Floor plans and perspective of the Maristán,
indicating the stages of the intervention (2019).
Legend FUTURE DOWN FLOOR
1. Restoration of main façade.
2. Original main hallway (no entrance
from street).
3. Disabled access platform and
reception.
4. Information desk.
5. Peristyle.
6. Patio.
7. Pool.
8.Archaeological remains. Distribution
of rooms.
9. Consolidation of main staircase.
10. Stabilisation of exterior walls.
11. Consolidated south portico.
12. Structural consolidation of east
dividing wall.
13. Disabled access lift (between patio
level and upper gallery).
Legend FUTURE FIRST FLOOR
1. Lightweight perimeter walkway to be
used as an elevated accessible path,
recreation of original routes, viewing of
archaeological remains and patios.
2. Original staircase. Lightweight
structure.
3. Disabled access lift.
4. New staircase (Phase 1).
5. South portico consolidated in Phase 1.
6. New simplified wooden porticoes.
7. Fully refurbished pool.
Disabled access entrance.
PHASE 2 PHASE 2
FASE II
C/ Bañuelo
PHASE 1 PHASE 1
C/ Portería de la Concepción
FASE
1
by Camilo Boito (1836-1914) in accordance with the
conditions that any new addition must meet in a
restoration
28
.
The pool was another incentive for this restora-
tion, which was planned based on the principles of
scientific restoration; the pool is visible because it
is marked out by walls, even if they have been al-
tered by additions, while the pool bottom has been
transformed but is recoverable. The advantage of
the pool from a preservation point of view is that
it is a structure that goes deep into the ground and
barely touches the surface to achieve its function,
making it less vulnerable –this simple fact has dela-
yed its alteration or destruction. In addition, it was
a useful resource for storing water across periods,
either as a tank or for hygiene and cleaning purpo-
ses. It is the second sector to which the principle of
use can be applied– transforming the architectural
elements and proposing, on the basis of its material
nature, its full integration into the finally restored
building.
This means that, similarly to the rest of the inter-
vention, when identifying the pool as an object, its
constituent elements as a construction piece must
be studied at an archaeological level, and also its
function as a water store with a hydraulic installa-
tion that allows water to enter and exit, cleaning
and makes the lions function, with added value
from an ornamental and symbolic perspective. Ar-
chaeology will carefully dissect this fundamental
piece of the Maristán; a study of the original paving
is also proposed and these remains should emerge
during an intervention that affects the whole space.
It is not uncommon during a project of this type
for valuable elements to emerge during the course
of the work, meaning it is important to envision a
need to adapt to the unforeseeable. This is also true
for studies of the walls that are related to archaeo-
logical research into establishing how the building
was constructed and the logic of its precisely fitting
elements in a brilliant moment in Hispano-Muslim
construction. The project is intended to contribute
to an in-depth knowledge of the Maristán while pre-
serving and enhancing it at the same time.
4. The construction project
In addition to a description of the planned cons-
truction solutions for restoring the southern half of
the Maristán, it should first be emphasised that the
original remains of the building are very poorly pre-
served. It is highly fortunate that the pillars of the
southern portico and part of the nearby walls are sti-
ll standing. The fact that the building was adapted
for other uses during its long history contributed to
maintaining the southern bay until the present day,
while the remaining wings that surrounded the pa-
tio fell by the wayside during successive processes
of ruin and demolition. Occupation of the site has
helped it endure over time, although this has led to
an excessive use of the materials and construction
elements as indicated below.
4.1 Filling on the site. The original paving and
the pool
The building progressively fell into ruin in a series
of processes that began in the 19th century with the
collapse of the west bay; these processes were res-
ponsible for the gradual elevation of the courtyard
and, as a result, the level of the ground floor paving.
The lack of a workforce and the economy made this
a frequent occurrence in the Albaicín in times past,
IL. 12. Pedro Salmerón Escobar. Deterioration of south portico
footing, lower level (2015).
28. CAPITEL, A. Metamorfosis de monumentos y teorías de la res-